Appliance Manufacturing Plant
5,000,000 sq. ft.
Aluminum Rolling Mill
3,000,000 sq. ft.
New England Industrial Center
1,000,000 sq. ft.
New Jersey Warehouse
750,000 sq. ft.
Columbus International Airport
610,000 sq. ft.
Wisconsin Manufacturing Plant
525,000 sq. ft.
Mining Equipment Manufacturer
515,000 sq. ft.
Ohio Distribution Center
340,000 sq. ft.
Ohio Manufacturing Plant
300,000 sq. ft.
Corrugated Box Plant
230,000 sq. ft.
Illinois Manufacturing Plant
125,000 sq. ft.
|
|
Case Studies
Wisconsin Manufacturing Plant
525,000 sq. ft.
Problem: An old, inefficient steam boiler heating system supplying space-heat to multiple buildings was plagued with numerous problems, including deteriorating supply and condensate return lines, and steam heaters that were inefficient and needing repairs. Building temperatures were uneven, and buildings used for welding and heat-treating had negative air pressure problems. The indoor air quality and working conditions were poor.
Solution: Management made the decision to outsource the energy and air quality problems. Cenergy Services designed, installed and commissioned a new space heating and ventilation system to reduce energy usage by 51%, and other operating costs (maintenance, repairs, chemicals, water and boiler supervision) by 11%. With the Cenergy Services “commissioning” (measurement and follow through), working conditions have improved and expectations have been met.
|