Appliance Manufacturing Plant
5,000,000 sq. ft.


Aluminum Rolling Mill
3,000,000 sq. ft.


New England Industrial Center
1,000,000 sq. ft.


New Jersey Warehouse
750,000 sq. ft.


Columbus International Airport
610,000 sq. ft.

Wisconsin Manufacturing Plant
525,000 sq. ft.


Mining Equipment Manufacturer
515,000 sq. ft.

Ohio Distribution Center
340,000 sq. ft.


Ohio Manufacturing Plant
300,000 sq. ft.


Corrugated Box Plant
230,000 sq. ft.


Illinois Manufacturing Plant
125,000 sq. ft.

Case Studies


Ohio Manufacturing Plant
300,000 sq. ft.


Problem: Old, poorly designed heating system resulted in high fuels costs, extremely negative air pressure in the building, cold dock door areas and poor indoor air quality.

Solution: A Non-Recirculating air heating system solved the negative air pressure problem. High temperature rise thru-wall space heaters located near the dock doors improved comfort levels and eliminated employee complaints about cold dock door areas. Fuel costs went down and indoor air quality went up.

   

©2000-2011 Cenergy Services - All Rights Reserved
866-242-0222  • 760 Long Road Crossing Dr.  • Chesterfield, MO 63005