Appliance Manufacturing Plant
5,000,000 sq. ft.


Aluminum Rolling Mill
3,000,000 sq. ft.


New England Industrial Center
1,000,000 sq. ft.


New Jersey Warehouse
750,000 sq. ft.


Columbus International Airport
610,000 sq. ft.

Wisconsin Manufacturing Plant
525,000 sq. ft.


Mining Equipment Manufacturer
515,000 sq. ft.


Ohio Distribution Center
340,000 sq. ft.


Ohio Manufacturing Plant
300,000 sq. ft.

Corrugated Box Plant
230,000 sq. ft.


Illinois Manufacturing Plant
125,000 sq. ft.

Case Studies


Ohio Distribution Center
340,000 sq. ft.


Problem: New, 4 year old retail chain distribution center had high operating costs. The large, very noisy, inefficient indirect gas-fired air turnover heating system was designed to run continuously. Employees also complained of cold dock areas and an overheated upper mezzanine.

Solution: A new high efficiency, direct gas-fired heating system was designed and installed. It reduced gas usage by 41%. The electrical load was reduced from 100 horsepower on a continuous basis to only 37.5 horsepower on an intermittent basis. The much quieter system made employees more productive because it also solved the cold dock door and hot mezzanine problems. Payback on the new heating system was less than two years.

   