Appliance Manufacturing Plant
5,000,000 sq. ft.


Aluminum Rolling Mill
3,000,000 sq. ft.

New England Industrial Center
1,000,000 sq. ft.


New Jersey Warehouse
750,000 sq. ft.


Columbus International Airport
610,000 sq. ft.

Wisconsin Manufacturing Plant
525,000 sq. ft.


Mining Equipment Manufacturer
515,000 sq. ft.

Ohio Distribution Center
340,000 sq. ft.

Ohio Manufacturing Plant
300,000 sq. ft.

Corrugated Box Plant
230,000 sq. ft.


Illinois Manufacturing Plant
125,000 sq. ft.

Case Studies


Illinois Manufacturing Plant
125,000 sq. ft.


Problem: Two manufacturing companies shared this 50-year-old brick building. The gas-fired hot water boiler system had high operating and maintenance costs. Employees of both companies complained the dock door areas were always cold during the winter.

Solution: The boiler heating system was
replaced with small, energy efficient gas-fired space heating system installed around the perimeter of the building. Fuel usage declined 62%. Combined with lower maintenance costs, the owners saw a simple payback of less than two years for their investment in the new heating system. The employees of both companies also enjoyed warm, balanced temperatures throughout the building, even at the dock doors.

   