Appliance Manufacturing Plant
5,000,000 sq. ft.


Aluminum Rolling Mill
3,000,000 sq. ft.


New England Industrial Center
1,000,000 sq. ft.


New Jersey Warehouse
750,000 sq. ft.


Columbus International Airport
610,000 sq. ft.

Wisconsin Manufacturing Plant
525,000 sq. ft.


Mining Equipment Manufacturer
515,000 sq. ft.

Ohio Distribution Center
340,000 sq. ft.

Ohio Manufacturing Plant
300,000 sq. ft.

Corrugated Box Plant
230,000 sq. ft.


Illinois Manufacturing Plant
125,000 sq. ft.

Case Studies


Appliance ManufacturerAppliance Manufacturing Plant
5,000,000 sq. ft.


Problem: Environmental issues required upgrading a steam boiler heating system for a large industrial campus with high bay manufacturing areas. The old steam generation system with a remote powerhouse was already very expensive to operate and maintain. Boiler operators were required 24/7 and the condensate return system was in poor condition. The cost to replace the boiler system to meet environmental requirements was prohibitive.

Solution: Cenergy designed, installed and commissioned a new space heating system that avoided the costs associated with retaining the boiler system. It reduced operating costs in half, provided even space temperatures and eliminated the boiler emissions problem.

   

©2000-2008 Cenergy Services - All Rights Reserved
866-242-0222  • 760 Long Road Crossing Dr.  • Chesterfield, MO 63005