Case Studies
Appliance Manufacturing Plant
5,000,000 sq. ft.
Problem: Environmental issues required upgrading a steam boiler heating system for a large industrial campus with high bay manufacturing areas. The old steam generation system with a remote powerhouse was already very expensive to operate and maintain. Boiler operators were required 24/7 and the condensate return system was in poor condition. The cost to replace the boiler system to meet environmental requirements was prohibitive.
Solution: Cenergy designed, installed and commissioned a new space heating system that avoided the costs associated with retaining the boiler system. It reduced operating costs in half, provided even space temperatures and eliminated the boiler emissions problem.
|