Appliance Manufacturing Plant
5,000,000 sq. ft.


Aluminum Rolling Mill
3,000,000 sq. ft.


New England Industrial Center
1,000,000 sq. ft.


New Jersey Warehouse
750,000 sq. ft.


Columbus International Airport
610,000 sq. ft.

Wisconsin Manufacturing Plant
525,000 sq. ft.


Mining Equipment Manufacturer
515,000 sq. ft.

Ohio Distribution Center
340,000 sq. ft.

Ohio Manufacturing Plant
300,000 sq. ft.

Corrugated Box Plant
230,000 sq. ft.


Illinois Manufacturing Plant
125,000 sq. ft.

Case Studies


Aluminum Rolling Mill
3,000,000 sq. ft.


Problem: Working conditions in the plant were very uncomfortable due to an old and unreliable boiler steam heating system. The result was poor employee morale and low productivity. Operating costs were high due to poor system performance and low energy efficiency. Maintenance, repair and replacement costs were also very high.

Solution: Cenergy engineered, installed and commissioned a new, more reliable and energy efficient space heating system on a “Fast Track” basis that prevented a work stoppage. Zone control of space temperatures provided more even heating where it was needed.

   

©2000-2010 Cenergy Services - All Rights Reserved
866-242-0222  • 760 Long Road Crossing Dr.  • Chesterfield, MO 63005